Edit Task: DurationMinOverlap

Format

SCHED / EditTask '<TaskName>' DurationMinOverlap <DurationMinOverlap>

Description

The DurationMinOverlap attribute under EditTask defines the minimum duration of overlap between adjacent assignments for this task. This value is only applicable if DurationIsOverlapRequired is set to TRUE.

Parameters

ParameterDescription
DurationMinOverlapA double value greater than or equal to zero that defines the task's minimum overlap duration constraint between this task's assignments. Any two assignments can overlap by a minimum of this duration value. Used when DurationIsOverlapRequired = true.

Examples

Sets the min overlap duration to 10s.

SCHED / EditTask 'TaskA' DurationMinOverlap 10